Road construction
Portfolio
A Record of Road construction
Major Projects in process of Completion
Capabilities:
1
Designing and construction of expressways and highways
3
Designing and construction of railway lines and related installations
2
Designing and construction of major and minor roads
4
Designing and creation of railway base
Major Completed Projects :
01
Construction of four-band of Chalous- Tonekabon expressway, part 3.1 with a lenght of 15 km
02
Tehran- Saveh Freeway, with a lenght of 123 Km, 32 meters width and earth works volume of 15 million m3 -Tehran
03
Tehran- Mashhad Double Railway with a lenght of 238 Km, Tehran- Khorasan
04
The 3rd part of Chah Eini Fars minor road. with a lenght of 20 km- Fars
05
Construction of the north band of Saveh- Hamadan freeway , with a lenght of 45 km, 13.5 width and earth works volume of 2.7 million m3, Hamadan
06
Construction of the 3&4 part of Ahvaz- Imam port , with a lenght of 30 Km.- khuzestan
07
Construction operations on the main structure of the fly-over crossing Hafez square, with a lenght of 175 meter and width of 35 meter, Mashhad
08
Bed construction for the railway between Shirinshahr to Farabi Unit with a lenght of 20 Km and grade- separated intersections for Ahwaz-Abadan Road and the railway
09
Bridge on Besat- Azadegan and Behesht Zahra intersections, with a lenght of 90 km and earth works volume of 80,000 m3 - Tehran crossing